heat preservation nail decorate. Extruded board exterior insulation system anchor pieces installation number; 1-10 layer on average 6 / ㎡, 11 - 20 an average of seven/square meter 21-26 layer 9 / ㎡. Any area is greater than zero. 1 ㎡ monolithic pull must add the anchoring piece, the number depending on the shape and site condition; In Yang Angle, under the eaves, around the edge of the hole, should be increasing the density of the anchorage parts, its distance is not more than 300 ㎜, is apart from the grassroots edge is not less than 60 mm