Sub-station

MPS

The construction site to save heat preservation nail

by:MPS     2020-11-11

although the cold winter has in the past, but there are still a lot of heat preservation engineering are still picking up, the market demand of heat preservation nail didn't reduce, on the issues relating to the construction site to save heat preservation nail still aroused people's concern.

the construction site environment is mixed and disorderly, the exchange of personnel, materials and all kinds of construction equipment, insulation nails smaller, improper preservation is prone to loss, damage, and so on and so forth. Therefore, the construction unit should be no specialist is responsible for the preservation of heat preservation material, construction equipment and access, prevent damage of construction equipment or material loss, also can prevent excessive use of workers, including heat preservation nail insulation materials.

bar with aluminum and plastic material of two kinds, small volume, mostly collected in the box, and mostly in the form of paper box, so manufacturers recommend that you select a dry, cool and ventilated place save heat preservation nail, and to ensure its far away from the water, fire, etc. , also want to prevent crushed by the weight, packing box deformation, heat preservation nail even damaged, and so on and so forth.

baowendingxinwen137。 HTML

related tags: heat preservation nail

a: corrosion environment can be used to heat preservation nail? Next up: construction used in heat preservation nail note

Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...